Projects

Adaptative light control-feasibility analysis

Research areas:
Status: Finished
Type Project: Public_Industrial
Project leaders: Miguel Ángel Sotelo; Manuel Ocaña
Collaborators: Luis M. Bergasa; Miguel Ángel G. Garrido; Ignacio Parra; Pedro Revenga
Funded by: IEE, S.A.
Funding: 15500.00 EUR
Proposed start date: 2006-03-15
Proposed end date: 2006-06-15